Our Projects

Details of our running and completed projects.

DETAILED DESIGN OF RUNWAY/AIRPORT

  • Consultancy Services for detailed Design of Construction of New Runway, Associated Pavements and allied works at Rasoolabad, Distt. Kanpur Dehat (Uttar Pradesh).
  • Consultancy Services for detailed Design of Proposed layout plan showing location of runway, apron, taxiway & Isolation bay Khushinagar International Airport (Uttar Pradesh).
  • Consultancy Services for detailed Design of Rehabilitation of Taxiway Papa Front Bay 1-9 in Delhi International Airport
  • Consultancy Services for detailed Design of Restoration of Basic strip, prevention of Soil erosion, Extension of apron and associated works at Shimla Airport.

DETAILED PROJECT REPORT

  • Consultancy Services for Preparation of Feasibility Report on Delhi-Jaipur Expressway (Green Field). 6 Lane, Project Length:- 296.9 km
  • Preparation of DPR for Widening & Strengthening of: Rajgarh to Bawal via Asraka Majra upto Bhadoj in Rewari District; Bawal to NH-8 via Russia was, Kheri Dalu Singh in Rewari District; Bawal to Badhrana from via Naichana, Sulkha in Rewari District; Jatusana – Guryani – Mubarikpur Road in Rewari District.
  • Consultancy services of preparation of Feasibility Report for Two-laning of Kherli to Pahari / NathanikaBada to Kathumar / Kherli to Nadbai to Kumher/Deeg to Kaman/ Up Border to Deeg to Pahari to Haryana Borderin the State of Rajasthan.
  • Consultancy services of preparation of Feasibility Report for Two-laning of Padampur to Bikaner/ Dungargarh to Rajgarh / Hanumangarh to Abohar (upto Punjab border)/ Sadulshahar to Srikaranpur in the State of Rajasthan.
  • Preparation of DPR & Analysis of Rates for Development of Access Controlled of 6 lane of Kundli-Manesar-Palwal (KMP) Expressway (Balance work) on BOT basis in state of Haryana.
  • Preparation of Feasibility Report for Planning & Construction of Grade separator of Umang Bhardwaj Chowk Flyover.
  • Design for Dadri & Loharu Division road:Dadri-Mahendergarh Road at Km. 76.460 to 59.460. Dadri-City Road 4 Lane Road; Siwan-Singhani Road at Km. 87.360 to 108.860; Hansi-Tosham-Behal Road at 178.200 to 202.500; Loharu-Stnali-Mohindergarh Road at Km. 85.60 to 95.00; Charkhi-Dadri-Chhuchhakwas Road (4.1 Km); Charkhi Dadri-Bhiwani Road at Km. 76.40 to 89.60.
  • Preparation of DPR for Widening & Strengthening of Ferojpur Jhirka Biwan Road To Maniyabass upto Rajasthan Border km. 0.00 to 3.49 (Road id 1165); Punhana to Lahanpur Sri Singalhar Khekri Jamalgarh Ranota Manota to Dhondal up to Rajasthan Border km. 0.00 to 12.98 (Road id 1284).
  • Consultancy Service for Preparation of DPR for 6 Lane (1.4 Km) of 60m wide Master Road from Pataudi Road to Sec. 37-C Gurgaon in the State of Haryana.
  • Detailed Design for Widening & strengthening of Master Road between Sector 17/18 from NH-8 to Old Delhi Road in Gurgaon District (4-Lane; Length: 1.8 Km).
  • Consultancy Services for Preparation of SRP, Initial Environmental Examination Report for 4-Lanning of NH-10 to old NH-71 to meet Southern Bypass Road in Rohtak District in the State of Haryana.
  • Consultancy services for preparation of feasibility report for Dwarka Expressway (from Km 20 of Nh-8 Near Shiv Murti till Km 40 of NH-8 Near Kherki Daula in State of Delhi and Haryana) as variation to consultancy service of Delhi-Jaipur Expressway.
  • Preparation of Detailed Project Report / Detailed Estimate and Structural Design for Project Construction of Flyover at Junction of Sector Dividing Road 56/57 & 61/62 with SPR in Gurugram
  • Preparation of Detailed Project Report / Detailed Estimate and Structural Design for Project Construction of Flyover at Junction of Sector Dividing Road 49/50 with SPR in Gurugram.
  • DPR/Detailed Estimate and Structural Design for the following project to be implemented in this Swarn Jayanti Year for the formation of the State; Construction of flyover at Bakhtawar Chowk (Sector 38/39, 46/47), Gurugram; Construction of underpass near Mayfield Garden (Sector-50,51,47) Gurugram.

DETAILED DESIGN

  • Consultancy Services for Carrying out Survey, Geotechnical Investigation and preparation of GADs, BOQ, Detailed Design, Working Drawings, Detailed estimate including required modifications during construction of two lane ROB at Gurugram, Pataudi, Rewari Road L/c No. 48 in Gurugram District on Delhi-Jaipur Railway Line, for Marc Technocrats limited (completed)
  • Consultancy Services for Carrying out Survey, Geotechnical Investigation and preparation of GADs, BOQ, Detailed Designing, Working Drawings, and Detailed estimate including Required Modifications during construction of two lane ROB at Wazirpur to Farrukh Nagar Road at L/c No. 34 in Gurugram District on Delhi-Jaipur Railway Line for Marc Technocrats limited. (completed)
  • Consultancy Services for Detailed out Survey, Geotechnical Investigation and preparation of GADs, BOQ, Detailed Design, Working Drawings, and Detailed Estimate including required modifications during construction of two lane ROB on Delhi-Jaipur Railway line at L/c No. 39 falling on Jamalpur-Farrukhnagar Road (ODR) near village Taj Nagar in Gurugram District, for Marc Technocrats limited. (completed)
  • Consultancy Services for Detailed Design of Four lane ROB of Level crossing No. 32-B on Suratgarh – Bathinda Sec of Railway line at km 315.240 on NH-10 in MandiDabwali (Haryana) (completed)
  • Consultancy Services for Detailed Design of Up-gradation of secton-1 Patagon to Khopoli (KM 43/783-69/508) part of NH-3 Shahpur-Murdad (NH-222)-MHAPSA-KARJAT-KHOPOLI-NH 4 section of newly declared NH-548A (The highway starting from its junction with NH-848A near shahpura and connecting Muradad Karjat Khalapur, Pali, Tale, Mannad and terminating at Agardanda) in the state of maharasthra. (In-progress)
  • Consultancy Services For Detailed Design of Redesigning, Rehabilitation and upgradation to four lane configuration & strengthening of Rohana/Hassan Garh to Jhajjar section from km- 44.800 to Km 80.250 (design chainage). (In-progress)
  • Consultancy Service for Detailed Design of Design and Construction of civil structures involving formation in Embankment/cutting,bridges,platforms, structures, buildings, yards and other allied works on Design- Build Lump sum basis for Rohtak-Meham of Rohtak-Meham-Hansi New BG line project. (In-progress)
  • Consultancy Service for Detailed Design of Design and Construction of civil structures involving formation in Embankment/cutting,bridges,platforms, structures, buildings, yards and other allied works on Design- Build Lump sum basis for Meham-Hansi of Rohtak-Meham-Hansi New BG line project. (In-progress)

DESIGN & PROJECT MANAGEMENT

  • Design & Project Management consultant for Quality Control for Construction of Master Roads Sector 75-89, Faridabad “Supply & aliening of Earth Work in Embankment, Granular Sub Base, wet Mix Macadam, Bituminous Concrete M-20 Cast in Situ Kerb & Channel, Reinforces Cement Concrete Drain, culverts and all other works contingent.

SUPERVISION CONSULTANCY

  • Consultancy Services for Supervision consultancy services (in association with Marc Technocrat Pvt. Ltd.) for the work of widening strengthening of Gohana-Lakhan Majra Meham Bhiwani Road (SH-16A) from Km 16.00 to Km 53.70 in Rohtak district (ADB funded); Project Length: 37.700 Km: Project Cost: 91.50 Crores. (completed)
  • Consultancy Services for Supervision consultancy services (in association with with Marc Technocrat Pvt. Ltd.) for the work of improvement of Bahadurgarh to Jhajjar road Km0.00 to 28.300 in Jhajjar District. (completed)
  • Consultancy Services for Supervision consultancy services (in association with with Marc Technocrat Pvt. Ltd.) For the Supervision Consultancy Services for the work of Improvement of Bahadurgarh to Badli road km 0.000 to 18.100 in Jhajjar District. (Completed)
  • Consultancy Services for Authority’s Engineer for Supervision of Project of Construction of Four Laning of Hisar to Dabwali Section of NH-10 from Km 170.000 to Km 227.000 with Paved Shoulder in the State of Haryana on Engineering Procurement and Construction (EPC) Basis (Package-1). (In association with CEMOSA) (Supervision Completed O&M in progress)
  • Consultancy Services for Authority’s Engineer for Supervision of Project of Construction of Four Laning of Hisar to Dabwali Section of NH-10 from Km 227.000 to Km 314.660 with Paved Shoulder in the State of Haryana on Engineering Procurement and Construction (EPC) Basis (Package-2). (In association with CEMOSA) (Supervision Completed O&M in progress)
  • Consultancy Services for Authority’s Engineer for Supervision of
    – Development to four lanes with paved shoulder of end of Sangrur bypass to Tapa section of NH-64 (NEW NH- NO. 7) from existing km 116.950 to km 138.030 & existing km 142.950 to 168.00 (Completed)
    – Development to four lanes with paved shoulder of end of Tapa to Bhatinda section of nh-64 (new NH- no. 7) from existing km 168.00 to 209.405 in the state of PUNJAB NHDP-IV(In association with AECOM) (completed)
  • Consultancy Services for Authority’s Engineer for “Design, Engineering, Finance, Construction, Operation and Maintenance of Gurugram Faridabad and BallabhgarhSohna Road in Faridabad and Gurugram District on BOT Basis Package no Haryana PWD (B&R)/BOT-4&5” (In association with AECOM) (Supervision Completed O&M in progress)
  • Consultancy Services for Authority’s Engineer for (in association with Marc Technocrat Pvt. Ltd.) “construction of Two Lane with Paved Shoulder of Puranpur-Khutar Section of NH-730 from Existing Km 38.000 to existing Km 82.000 in the State of Uttar Pradesh on EPC Mode”. (Supervision Completed O&M in progress)
  • Consultancy Services for Authority’s Engineer for (in association with Marc Technocrat Pvt. Ltd.)”construction of Two Lane with Paved Shoulder of Puranpur-Khutar Section of NH-730 from Existing Km 0.000 to existing Km 38.000 in the State of Uttar Pradesh on EPC Mode. (In progress)
  • Consultancy Services for Authority’s Engineer (in association with CEMOSA) Rehabilitation and upgradation to 2-Lane with Paved shoulder for Jind-Gohana Road from Design chainage km 0+000 to km 50+505 (Length 50.505 km) of Nh-352 A under NH (O) in the State of Haryana (in progress)
  • Consultancy Services for Authority’s Engineer (in association with CEMOSA) Rehabilitation and upgradation to 2-Lane with Paved shoulder for Bhiwani-Mundal-Jind Road from Design Chainage Km 6+875 to km 68+857 (Length 61.982 km) of NH-709 A in the Stata of Haryana under NH (O) (Package-I) (In progress)
  • Consultancy Services for Authority’s Engineer (in association with CEMOSA) Rehabilitation and upgradation to 2-Lane with Paved shoulder for Jind-Karnal section from existing km 68+660 (Design km 68+857) i.e. junction with Narwana Road (NH-352) at Subash Chowk and ends at km 153+700 (Design 154+219) at ITI Chowk which is the intersection with NH-1 of NH 709 A in the State of Haryana under NH (O) (Package-II) (In progress)

ENGINEERING REPORT (HYBRID ANNUITY MODE)

  • Fore laning Chikhali-Tarsod (Package- IIA) Section of NH-6 from Km 360.000 to Km 422.700 in the state of Maharashtra to be executed on Hybrid Annuity Mode.
  • Fore laning of Gagalheri-Saharanpur- Yamunanagar (UP/Haryana Border) Section of Nh- 73 from Km 33.000 (Design chainage Km 35.400) to Km 71.640 (Design chainage Km 86.855) in the state of Uttar Pradesh underv NHDP-IV on Hybrid Annuity Mode.
  • Fore laning of Chutmalpur- Ganeshpur section of NH-72A from Km 0.000 (Km 22.825 of NH- 73) to Km 16.000 (Design chainage Km17.900) & Roorkee-Chumalpur- Gangalheri section of Nh-73 from km 0.000 (km 167.800 of NH-58) to km 33.000 (Design chainage Km 35.400)
  • Redesigning, Rehabilitation and Upgradation to Four lane configuration & Strengthening of Rohna/Hassangarh to Jhajjar section from km 44.80 to km 80.250 (Design Chainage ) (Length:- 35.450 km ) of NH- 334B in the state of Haryana on Hybrid Annuity Mode.
  • Up gradation to 2 lane with paved shoulder/4 lane of Khajuwala-Poogal section (Design Chainage 0.000 to 30.812) and poogal-dantour-jaggasar-gokul-goddu-ranjeetpura-charanwala-naukh-bap section of NH-911 (Design Chainage 1.430 to 182.725) Total Length:- 212.107 km  under Bharatrmala Pariyojna in the state of Rajasthan on Hybrid Annuity Mode.

RAILWAY PROJECTS

  • Design and Construction and Civil Structures Involving formation in Embankment/cutting Bridge, Platforms, Structures, Buildings, Yards and other allied works on Design- Build lump sum basis for Meham-Hansi Section of Rohtak-Meham-Hansi New BG Line Projects.
  • Design and Construction and Civil Structures Involving formation in Embankment/cutting Bridge, Platforms, Structures, Buildings, Yards and other allied works on Design- Build lump sum basis for Rohtak- Meham Section of Rohtak-Meham-Hansi New BG Line Projects